    Grizzly Bear Creek Wind Power Plant Connection (1250)

    Enel Alberta Wind Inc. (Enel) has applied to the Alberta Electric System Operator (AESO) for transmission system access to connect it’s approved Grizzly Bear Creek Wind Power Plant (Facility) in the Vermilion area.  Enel's request can be met by the following solution

    • Add one 144 kilovolt (kV) transmission line to connect the Facility to the existing 144 kV transmission line 7L65 in a T-tap configuration.
    • Add or modify associated equipment as required for the above transmission developments.

    Need overview

    Updated Need Overview: Grizzly Bear Creek Wind Power Plant Connection [Posted: July 8, 2021]

    Need for Developments in the Vermilion and Vegreville Areas to Connect the Grizzly Bear Creek Wind Power Plant [Posted: December 7, 2015]

    Notification of regulatory filing advertisement

    Notification of Regulatory Filing [Posted: May 9, 2016]

    Needs Identification Document

    Grizzly Bear Creek Wind Power Plant Connection NID [Posted: May 30, 2016]

    Contact us

    We appreciate your views, both on the need for transmission system development and proposed transmission plans. If you have any questions or comments, please contact us directly.

    AESO Stakeholder Relations
    stakeholder.relations@aeso.ca
    1-888-866-2959

    Latest updates

    • Jul. 8, 2021 Grizzly Bear Creek Wind Power Plant Connection