Peace Butte Wind Energy Connection (513)
The Pteragen Canada Inc. request for system access service to connect its Peace Butte Wind Power Project in the Medicine Hat area was cancelled on May 12, 2021.
Cancellation of Needs Identification Document
Peace Butte Wind Energy Connection Needs Identification Document Cancellation [Posted: August 30, 2021]
Notice
- Cancellation Notice for the Peace Butte Wind Energy Connection [Posted: Aug. 12, 2021]
Needs Identification Document
Garden Peace Butte Wind Energy Connection Needs Identification Document [Posted: June 19, 2012]
Appendix A - Connection Assessment
Appendix B - AESO PIP
Appendix C - TFO Capital Cost Estimate
Appendix D - Commission Rule 007, NID12
Notification of Regulatory Filing
- Notice of regulatory filing for the Peace Butte Wind Energy Connection in the Medicine Hat Area [Posted: June 1, 2012]
Need overview
- Need for the Peace Butte Wind Energy Connection in the Medicine Hat Area [Posted: April 25, 2012]
Latest updates
- AESO NID Cancellation Filed: Peace Butte Wind Energy Connection