Lathom Solar GP Ltd. (Lathom Solar) has applied to the AESO for transmission system access to connect its approved Lathom Solar Project (Facility) in the Bassano area. Lathom Solar’s request can be met by the following solution:
- Add one 138 kilovolt (kV) transmission line to connect the Facility to the existing 138 kV transmission line 853AL in a T-tap configuration.
- Add or modify associated equipment as required for the above transmission developments.