    Suncor Forty Mile Wind Power Project 964L Connection (1812)

    Forty Mile Granlea Wind GP Inc. (Forty Mile GP) a wholly owned subsidiary of Suncor Energy Inc. has submitted two applications to the Alberta Electric System Operator (AESO) for transmission system access to connect its proposed Suncor Forty Mile Wind Power Project (Facility) in the Maleb area. One of these requests can be met by a connection to the existing Whitla 251S substation, as further described in the AESO Need Overview Update (October 2018), "Need for the Suncor Forty Mile Wind Power Project Whitla Connection in the Maleb area". Forty Mile GP's other request can be met by the following solution:

    • Add one 240 kV transmission line to connect the Facility and the existing 240 kV transmission line 964L.
    • Add or modify associated equipment as required for the above transmission developments.

    Need overview

    Update - Need for the Suncor Forty Mile Wind 964L Connection in the Maleb area [Posted: October 30, 2018]

    Need for the Suncor Forty Mile Wind Power Project 964L Connection in the Maleb area [Posted: October 27, 2017]

    Market Participant Notification

    Market Participant Notification for the Suncor Forty Mile Wind Power Project Connection [Posted: October 25, 2018]

    Notification of Regulatory Filing 

    Notice of Filing for the Suncor Forty Mile Wind Power Project 964L Connection [Posted: November 19, 2018]

    Needs Identification Document

    Suncor Forty Mile Wind Power Project 964L Connection Needs Identification Document [Posted: December 6, 2018]

    Appendix A - Connection Assessment
    Appendix B - TFO Capital Cost Estimate
    Appendix C - AESO Participant Involvement Program
    Appendix D - Commission Rule 007, Section 6.2.1 NID15(2)

    Latest updates

    • Dec. 6, 2018 AESO NID Filed: Suncor Forty Mile Wind Power Project 964L Connection
    • Nov. 19, 2018 Notice of Filing for the Suncor Forty Mile Wind Power Project 964L Connection
    • Oct. 30, 2018 Update - Need for the Suncor Forty Mile Wind 964L Connection in the Maleb area
    • Oct. 25, 2018 Market Participant Notification for the Suncor Forty Mile Wind Power Project 964L Connection
    • Oct. 27, 2017 Need for the Suncor Forty Mile Wind Power Project 964L Connection in the Maleb area