SCL1 Syncrude #1 temporary change in maximum capability (MC) notice
Syncrude Canada Ltd. has advised the AESO that, effective June 27, 2020, the MC of existing asset SCL1 will increase to 150 MW in the Energy Trading System. This is a temporary change expected to last until mid-October. The monthly outage and short term outage graphs will be updated in the normal manner on the AESO’s website based on the information entered in the Energy Trading System.