    Transmission Enhancements in the Northeast Edmonton area (2453)

    EPCOR Distribution & Transmission Inc. (EPCOR) has applied to the AESO for transmission system access to reliably serve a new industrial demand for electricity in the Northeast Edmonton area. EPCOR’s request can be met by the following solution:

    • Add one 240 kilovolt (kV) transmission line to connect a new industrial facility to the existing Clover Bar 987S substation in a radial configuration.
    • Modify the Clover Bar 987S substation, including adding two 240 kV circuit breakers.
    • Add or modify associated equipment as required for the above transmission developments.

    Need Overview

    Latest updates

    • Feb. 8, 2022 Need Overview: Transmission Enhancements in the Northeast Edmonton area