    Dolcy Solar + Energy Storage Project Connection (2553)

    Dolcy Solar Inc., (Dolcy Solar) has applied to the AESO for transmission system access to connect its approved Dolcy Solar + Energy Storage Project (Facility) in the Wainwright area. Dolcy Solar’s request can be met by the following solution:

    • Add one 240 kilovolt (kV) transmission line, to connect the Facility to the existing 240 kV transmission line 948L using a T-tap configuration.
    • Add or modify associated equipment as required for the above transmission developments.

    Need Overview

    Latest updates

    • Feb. 5, 2025 Need Overview: Dolcy Solar + Energy Storage Project Connection