    Saddlebrook Solar and Storage Project Connection (2334)

    TransCanada Energy Ltd. (TCE) has applied to the Alberta Electric System Operator (AESO) for transmission system access to connect its proposed Saddlebrook Solar and Storage Project (Facility) in the Town of High River area. TCE's request can be met by the following solution:

    • Add one 138 kilovolt (kV) transmission line to connect the Facility to the existing 138 kV transmission line 727AL in a T-tap configuration.
    • Add or modify associated equipment as required for the above transmission developments.

    Market Participant Notification

    Need Overview

    Latest updates

    • Dec. 2, 2021 Market Participant Notification for the Saddlebrook Solar and Storage Project Connection in the Town of High River area
    • Oct. 28, 2021 Need Overview: Saddlebrook Solar and Storage Project Connection