    Pembina Gas Infrastructure (PGI) has applied to the AESO for transmission system access to connect its approved Kaybob #3 South Gas Plant (Facility) in the High River area. PGI’s request can be met by the following solution:

    • Add one 138 kilovolt (kV) transmission line to connect the Facility to the existing 138 kV transmission line 864L in a T-tap configuration.
    • Add or modify associated equipment as required for the above transmission developments.

    Need Overview

    Latest updates

    • Feb. 5, 2025 Need Overview: Kaybob South 3 Cogeneration Project Connection