Kaybob South 3 Cogeneration Project Connection (2676)
Pembina Gas Infrastructure (PGI) has applied to the AESO for transmission system access to connect its approved Kaybob #3 South Gas Plant (Facility) in the High River area. PGI’s request can be met by the following solution:
- Add one 138 kilovolt (kV) transmission line to connect the Facility to the existing 138 kV transmission line 864L in a T-tap configuration.
- Add or modify associated equipment as required for the above transmission developments.
Need Overview
- Need for the Kaybob South 3 Cogeneration Project Connection [Posted: Feb. 5, 2025]
Latest updates
- Need Overview: Kaybob South 3 Cogeneration Project Connection