Lone Butte Solar Project Connection (2552)
Lone Butte Solar Project Corp. (Lone Butte) has applied to the AESO for transmission system access to connect its proposed Lone Butte Solar Project (Facility) in the Torrington area. Lone Butte’s request can be met by the following solution:
- Add one 240 kilovolt (kV) transmission line to connect the Facility to the existing 240 kV transmission line 929L in a T-tap configuration.
- Add or modify associated equipment as required for the above transmission developments.
Need Overview
- Need for the Lone Butte Solar Project Connection [Posted: Jan. 31, 2025]
Latest updates
- Need Overview: Lone Butte Solar Project Connection