    Luna Solar Project Connection (2447)

    Northland Power Luna I GP (Northland Power) has applied to the AESO for transmission system access to connect its approved Luna Solar+ Phase One (Facility) in the Brooks area. Northland Power’s request can be met by the following solution:

    • Add one 240 kilovolt (kV) transmission line to connect the Facility to the existing 240 kV transmission line 935L in a T-tap configuration.
    • Add one 240 kV transmission line to connect the Facility to the existing 240 kV transmission line 923L in a T-tap configuration.
    • Add or modify associated equipment as required for the above transmission developments.

    Need Overview

    Latest updates

    • Dec. 4, 2024 Updated Need Overview: Luna Solar Project Connection
    • Apr. 19, 2023 Need Overview: Luna Solar Project Connection