Luna Solar Project Connection (2447)
Northland Power Luna I GP (Northland Power) has applied to the AESO for transmission system access to connect its approved Luna Solar+ Phase One (Facility) in the Brooks area. Northland Power’s request can be met by the following solution:
- Add one 240 kilovolt (kV) transmission line to connect the Facility to the existing 240 kV transmission line 935L in a T-tap configuration.
- Add one 240 kV transmission line to connect the Facility to the existing 240 kV transmission line 923L in a T-tap configuration.
- Add or modify associated equipment as required for the above transmission developments.
Need Overview
- Update - Need for the Luna Solar Project Connection [Posted: Dec. 4, 2024]
- Need for the Luna Solar Project Connection in the Brooks area [Posted: April 19, 2023]
Latest updates
- Updated Need Overview: Luna Solar Project Connection
- Need Overview: Luna Solar Project Connection