Big Rock Solar Battery Project Connection (P2592)
Enerfin Energy Company of Canada Inc. (Enerfin) has applied to the AESO for transmission system access to connect its proposed Big Rock Solar Battery Project (Facility) in the High River area. Enerfin’s request can be met by the following solution:
- Add one 138 kilovolt (kV) transmission line, to connect the Facility to the existing 138 kV transmission line 812L using a T-tap configuration.
- Modify the existing High River 65S substation, including adding one 138 kV circuit breaker.
- Add or modify associated equipment as required for the above transmission developments.
Need Overview
- Need for the Big Rock Solar Battery Project Connection [Posted: June 18, 2025]
Latest updates
- Need Overview: Big Rock Solar Battery Project Connection