Sunrise Solar Project LP (Sunrise) has applied to the AESO for transmission system access to connect its proposed Sunrise Solar Project (Facility) in the Pincher Creek area. Sunrise’s request can be met by the following solution:
- Add one 138 kV transmission line to connect the Facility to the existing 138 kV transmission line 412L using a T-tap configuration.
- Add or modify associated equipment as required for the above transmission developments.
Need Overview
- Need for the Sunrise Solar Project Connection in the Pincher Creek area [Posted: Oct. 9, 2024]
Latest updates
- Need Overview: Sunrise Solar Project Connection