Canyon Creek Pumped Hydro Energy Storage Project Connection (1756)
Turning Point Generation(TPG) has applied to the AESO for transmission system access to connect its proposed Canyon Creek Pumped Hydro Energy Storage Project (Facility) in the Hinton area. TPG’s request can be met by the following solution:
- Add one 138 kilovolt (kV) transmission line to connect the Facility to the existing 138 kV transmission line 745AL in a T-tap configuration.
- Add or modify associated equipment as required for the above transmission developments.
Need Overview
Need for the Canyon Creek Pumped Hydro Energy Storage Project Connection in the Hinton area [Posted: Sept. 22, 2020]
Market Participant Notification
Market Participant Notification for the Canyon Creek Pumped Hydro Energy Storage Project Connection in the Hinton area [Posted: Dec. 11, 2020]
Notice of Filing
Notice of Filing for the Canyon Creek Pumped Hydro Energy Storage Project Connection [Posted: Jan. 7, 2021]
Latest updates
- Notice of Filing: Canyon Creek Pumped Hydro Energy Storage Project Connection
- Market Participant Notification for the Canyon Creek Pumped Hydro Energy Storage Project Connection in the Hinton area
- Need Overview: Canyon Creek Pumped Hydro Energy Storage Project Connection