New Section 502.10 of the ISO rules, Revenue Metering Technical Requirements
An application approval of Proposed New Section 502.10, Revenue Metering Technical Requirements was submitted on February 10, 2021, to the Alberta Utilities Commission (AUC). For information regarding the application, you may visit the AUC’s eFiling site and go to proceeding #26304.
-
AESO Reply Letter
AESO Reply Letter [Posted: January 29, 2021]
- Stakeholder Comments and AESO Replies Matrix – New Section 502.10 and Stakeholder Comments;
- Stakeholder Comments and AESO Replies Matrix – New Section 502.10 Terms and Definitions;
- Blackline and clean copies of the final proposed Section 502.10; and
- Blackline and clean copies of the new and amended terms and definitions.
-
Stakeholder Comments on Letter of Notice
Stakeholder Comments on Letter of Notice the Proposed Final Draft Section 502.10 of the ISO Rules, Revenue Metering System Technical and Operating Requirements [Posted: January 13, 2021]
Final Proposed New Section 502.10
- AltaLink Management Ltd.
- ATCO Electric Ltd.
- EPCOR Distribution & Transmission Inc.
- FortisAlberta Inc.
- Rodan Energy Solutions
- TransCanada Energy Ltd.
Final Proposed New Section 502.10 Terms and Definitions
- AltaLink Management Ltd.
- ATCO Electric Ltd.
- EPCOR Distribution & Transmission Inc.
- FortisAlberta Inc
-
Letter of Notice of the Proposed Final Draft Section 502.10
Letter of Notice of the Proposed Final Draft Section 502.10 of the ISO Rules, Revenue Metering System Technical and Operating Requirements [Posted: December 2, 2020]
- Stakeholder Comment Matrix – Proposed Final Draft of Section 502.10
- Stakeholder Comment Matrix – Section 502.10 Terms and Definitions
- Clean copy of the proposed final draft of Section 502.10
- Blackline of the proposed final draft of Section 502.10 from previous version posted November 18, 2019
- Copy of the proposed new and amended terms and definitions
-
Stakeholder Comments on Update Letter
Stakeholder Comments on Update Letter for Additional Feedback on the Development of Proposed New ISO Rule – Section 502.10, Revenue Metering Technical Requirements [Posted: June 30, 2020]
Stakeholder Comments – Proposed Applicability of New Section 502.10
Stakeholder Comments – Additional Feedback for New Section 502.10
-
Update Letter on Proposed New ISO Rule – Section 502.10
Update Letter for Additional Feedback on the Development of a Proposed New ISO Rule – Section 502.10, Revenue Metering Technical Requirements [Posted: May 21, 2020]
Related Material:
- Stakeholder Comment Matrix – Proposed Applicability of New Section 502.10;
- Stakeholder Comment Matrix – Additional Feedback for New Section 502.10;
- December 11, 2019 Stakeholder Session Minutes;
- Copy of proposed new Section 502.10 posted on November 18, 2019 in the Invitation to Stakeholder Consultation Session;
- Copy of proposed new and amended definitions posted on November 18, 2019 in the Invitation to Stakeholder Consultation Session.
-
Stakeholder Consultation Session December 11, 2019
Stakeholder Consultation Session December 11, 2019 Presentation [Posted: December 10, 2019]
-
Invitation to Stakeholder Consultation Session
Invitation to the Stakeholder Consultation Session on the Development of the Proposed New Section 502.10 of the ISO Rules – Revenue Metering Technical and Operation Requirements [Posted: November 18, 2019]
Related Material
1) AESO Measurement System Standard
2) Other regulatory documents:
i. AUC Rule 021 Settlement System Code Rules
ii. Electricity and Gas Inspection Act
iii. Electricity and Gas Inspection Regulations
iv. E-27 - Policy on the use of electricity meters in net metering applications
v. S-E-02 - Specifications for the verification and the reverification of electricity meters
vi. S-E-05 - Specification for approval of type of electronic meters—net metering
vii. S-E-07 -- Specifications for the approval of measuring instrument transformers
3) Previous Workgroup meeting notes:
i. Workgroup Meeting #1 held January 27, 2017
ii. Workgroup Meeting #2 held March 3, 2017
iii. Workgroup Meeting #3 held April 28, 2017
iv. Workgroup Meeting #4 held June 29, 2017
4) Proposed new Section 502.10
5) Section 502.10 blacklined against draft rule reviewed with Workgroup, May 15, 2018
-
Letter of Invitation to Participate
Letter of Invitation to Participate [Posted: October 11, 2016]