Oyen 1 Solar Project Connection (2611)
UK Solar East Ltd (UK Solar) has applied to the AESO for transmission system access to connect its proposed Oyen 1 Solar Project (Facility) in the Oyen area. UK Solar’s request can be met by the following solution:
- Add one 240 kilovolt (kV) transmission line to connect the Facility to the existing Lanfine 959S substation in a radial configuration.
- Modify the existing Lanfine 959S substation, including adding two 240 kV breakers.
- Add or modify associated equipment as required for the above transmission developments.
Needs Identification Document
Oyen 1 Solar Project Connection Needs Identification Document [Posted: March 17, 2026]
Appendix A - Connection Assessment
Appendix B - Capital Cost Estimates
Appendix C - AESO PIP Summary
Appendix D - Environment and Land Use Assessment
Need Overview
- Need for the Oyen 1 Solar Project Connection [Posted: Jan. 15, 2025]
Market Participant Notification
- Market Participant Notification Letter for Oyen 1 Solar Project Connection [Posted: Jan 19, 2026]
Latest updates
- NID filed: Oyen 1 Solar Project Connection
- Need Overview: Oyen 1 Solar Project Connection