Dunmore Solar Power Project Connection (2337)
Dunmore Solar Inc. (Dunmore) has applied to the Alberta Electric System Operator (AESO) for transmission system access to connect its proposed Dunmore Solar Power Project (Facility) in the Dunmore area. Dunmore's request can be met by the following solution:
- Add one 138 kilovolt (kV) transmission line to connect the Facility to the existing 138 kV transmission line 676L in a T-tap configuration.
Add or modify associated equipment as required for the above transmission developments.
Needs Identification Document
Dunmore Solar Power Project Connection Needs Identification Document Checklist [Posted: Dec. 3, 2021]
- Attachment A - TFO Cost Estimate
- Attachment B - Single Line Diagram
Notice of Filing
- Notice of Filing for the Dunmore Solar Power Project Connection [Posted: Oct. 7, 2021]
Market Participant Notification
- Market Participant Notification for the Dunmore Solar Power Project Connection in the Dunmore area [Posted: Sept. 17, 2021]
Need Overview
Latest updates
- AESO Checklist NID Filed: Dunmore Solar Power Project Connection
- Notice of Filing: Dunmore Solar Power Project Connection
- Market Participant Notification for the Dunmore Solar Power Project Connection in the Dunmore area
- Dunmore Solar Power Project Connection