    Dunmore Solar Power Project Connection (2337)

    Dunmore Solar Inc. (Dunmore) has applied to the Alberta Electric System Operator (AESO) for transmission system access to connect its proposed Dunmore Solar Power Project (Facility) in the Dunmore area. Dunmore's request can be met by the following solution:

    • Add one 138 kilovolt (kV) transmission line to connect the Facility to the existing 138 kV transmission line 676L in a T-tap configuration.

    Add or modify associated equipment as required for the above transmission developments.

    Needs Identification Document

    Dunmore Solar Power Project Connection Needs Identification Document Checklist [Posted: Dec. 3, 2021]

    Notice of Filing

    Market Participant Notification

    Need Overview

    Latest updates

    • Dec. 3, 2021 AESO Checklist NID Filed: Dunmore Solar Power Project Connection
    • Oct. 7, 2021 Notice of Filing: Dunmore Solar Power Project Connection
    • Sep. 17, 2021 Market Participant Notification for the Dunmore Solar Power Project Connection in the Dunmore area
    • Jul. 14, 2021 Dunmore Solar Power Project Connection