Halkirk 2 Wind Power Project Connection (2441)
Capital Power (Halkirk 2) L.P. (Capital Power) has applied to the AESO for transmission system access to connect its approved Halkirk 2 Wind Power Project (Facility) in the Halkirk area. Capital Power’s request can be met by the following solution:
- Add one 240 kilovolt (kV) transmission line to connect the Facility to the existing 240 kV transmission line 9L16 using a T-tap configuration.
- Add or modify associated equipment as required for the above transmission developments.
Needs Identification Document
Halkirk 2 Wind Power Project Connection Needs Identification Document [Posted: Jan. 29, 2024]
Appendix A - Connection Assessment
Appendix B - Capital Cost Estimate
Appendix C - AESO PIP
Notice of Filing
The AESO intends to file the Halkirk 2 Wind Power Project Connection Needs Identification Document (NID) application with the Alberta Utilities Commission (AUC) on or after January 26, 2024.
Market Participant Notification
- Market Participant Notification for the Halkirk 2 Wind Power Project Connection in the Halkirk area [Posted: Dec. 15, 2023]
Need Overview
- Need for the Halkirk 2 Wind Power Project Connection in the Halkirk area [Posted: August 2, 2023]
Latest updates
- AESO NID filed: Halkirk 2 Wind Power Project Connection
- Notice of Filing: Halkirk 2 Wind Power Project Connection
- Market Participant Notification for the Halkirk 2 Wind Power Project Connection in the Halkirk area
- Need Overview: Halkirk 2 Wind Power Project Connection