Hutchison Battery Energy Storage Facility Connection (2517)
Enfinite LP. (Enfinite) has applied to the AESO for transmission system access to connect its proposed Hutchison Battery Energy Storage Facility (Facility) in the Medicine Hat area:
- Add one 240 kV transmission line to connect the Facility to the existing Bowmanton 244S substation in a radial configuration.
- Modify the existing Bowmanton 244S substation, including adding one 240 kV circuit breaker.
- Add or modify associated equipment as required for the above transmission developments.
Need Overview
- Need for the Hutchison Battery Energy Storage Facility Connection [Posted: December 10, 2025]
Latest updates
- Need Overview: Hutchison Battery Energy Storage Facility Connection