Lamoureux Solar STL Inc. (Lamoureux Solar) has applied to the AESO for transmission system access to connect its proposed Lamoureux Ruby Solar Battery (Facility) in the Fort Saskatchewan area. Lamoureux Solar’s request can be met by the following solution:
- Add one 138 kilovolt (kV) transmission line to connect the Facility to the existing Lamoureux 71S substation using a radial configuration.
- Modify Lamoureux 71S substation, including adding one 138 kV circuit breaker.
- Add or modify associated equipment as required for the above transmission developments.