    Peace Butte Wind Power Project Connection (2467)

    Pteragen Canada Inc. (Pteragen Wind) has applied to the AESO for transmission system access to connect its approved Peace Butte Wind Project (Facility) in the Medicine Hat area. Pteragen Wind’s request can be met by the following solution:

    • Add one 138 kilovolt (kV) transmission line to connect the Facility to the existing 138 kV transmission line 600L using a T-tap configuration.
    • Add or modify associated equipment as required for the above transmission developments.

    Needs Identification Document

    Peace Butte Wind Power Project Connection Needs Identification Document [Posted: Mar. 31, 2025]

    Appendix A - Connection Assessment
    Appendix B - Capital Cost Estimate
    Appendix C - AESO PIP Summary

    Market Participant Notification

    Need Overview

    Latest updates

    • Mar. 31, 2025 AESO NID Filed: Peace Butte Wind Power Project Connection
    • Nov. 7, 2024 Market Participant Notification for the Peace Butte Wind Power Project in the City of Medicine Hat area