Tempest Wind Power Project Connection (2490)
TransAlta Coaldale Wind (TransAlta) has applied to the AESO for transmission system access to connect its proposed Tempest Wind Power Project (Facility) in the Taber area. TransAlta’s request can be met by the following solution:
- Add one 138 kilovolt (kV) transmission line to connect the Facility to the existing 138 kV transmission line 172EL in a T-tap configuration.
- Add or modify associated equipment as required for the above transmission developments.
Needs Identification Document
Tempest Wind Power Project Connection Needs Identification Document [Posted: Jul. 4, 2024]
Appendix A - Connection Assessment
Appendix B - Capital Cost Estimate
Appendix C - AESO PIP
Notice of Filing
The AESO intends to file the Tempest Wind Power Project Connection Needs Identification Document (NID) application with the Alberta Utilities Commission (AUC) on or after June 27, 2024.
Market Participant Notification
- Market Participant Notification for the Tempest Wind Power Project Connection [Posted: May 29, 2024]
Need Overview
- Need for the Tempest Wind Power Project Connection in the Taber area [Posted: June 14, 2023]
Latest updates
- AESO NID Filed: Tempest Wind Power Project Connection
- Notice of Filing: Tempest Wind Power Project Connection
- Market Participant Notification for the Tempest Wind Power Project Connection
- Need Overview: Tempest Wind Power Project Connection