    Winnifred Wind Power Project Connection (2137)

    Enerfin Energy Company of Canada Inc. (Enerfin) has applied to the AESO for transmission system access to connect its proposed Winnifred Wind Power Project (Facility) in the Whitla area. Enerfin's request can be met by the following solution:

    • Add one 138 kilovolt (kV) transmission line to connect the Facility to the existing Bullshead 523S substation in a radial configuration.
    • Modify the Bullshead 523S substation, including adding one 138 kV circuit breaker.
    • Add or modify associated equipment as required for the above transmission developments.

    Need overview

    Notice of filing

    Needs Identification Document

    Winnifred Wind Power Project Connection Needs Identification Document Checklist [Posted: June 21, 2021]

    Attachment A - TFO and MP Cost Estimates
    Attachment B - Single Line Diagram

    Latest updates

    • Jun. 21, 2021 AESO NID Filed: Winnifred Wind Power Project Connection
    • May. 20, 2021 Notice of Filing for the Winnifred Wind Power Project Connection
    • Jan. 12, 2021 Updated Need Overview: Winnifred Wind Power Proejct Connection
    • Oct. 31, 2019 Need Overview: Winnifred Wind Power Project Connection