FCS1 Fox Coulee Solar Change in Maximum Capability (MC) Notice
Subra Limited Partnership has advised the AESO that, effective Aug. 28, 2024, the MC of existing asset FCS1 will increase to 80 MW. Please note that the MC change will be reflected on the Current Supply Demand Report effective Aug. 28, 2024.