Your browser is no longer supported

To get the best experience with www.aeso.ca, we suggest using a newer version of Internet Explorer/Edge, or using another supported browser such as Google Chrome.

ETS users may continue to log in using Internet Explorer 9 using the upper right hand link marked ETS Login.

    View all projects

    Brooks Solar Farm Connection (1927)

    Solar Krafte Utilities Inc. (Solar Krafte) has applied to the AESO for transmission system access to connect its proposed  Brooks Solar Farm (Facility) in the Brooks area. Solar Krafte’s request can be met by the following solution:

    • Add one 240 kilovolt (kV) transmission line to connect the Facility to the existing Cassils 324S substation in a radial configuration.
    • Modify the Cassils 324S substation, including adding one 240 kV circuit breaker.
    • Add or modify associated equipment as required for the above transmission developments.

    Needs Identification Document

    Brooks Solar Farm Connection Needs Identification Document Checklist [Posted: Mar. 25, 2022]

    Notice of Filing

    The AESO intends to file the Brooks Solar Farm Connection Needs Identification Document (NID) application with the Alberta Utilities Commission (AUC) on or after March 25, 2022

    Market Participant Notification

    Need Overview