    Brooks Solar Farm Connection (1927)

    Solar Krafte Utilities Inc. (Solar Krafte) has applied to the AESO for transmission system access to connect its proposed  Brooks Solar Farm (Facility) in the Brooks area. Solar Krafte’s request can be met by the following solution:

    • Add one 240 kilovolt (kV) transmission line to connect the Facility to the existing Cassils 324S substation in a radial configuration.
    • Modify the Cassils 324S substation, including adding one 240 kV circuit breaker.
    • Add or modify associated equipment as required for the above transmission developments.

    Needs Identification Document

    Brooks Solar Farm Connection Needs Identification Document Checklist [Posted: Mar. 25, 2022]

    Notice of Filing

    The AESO intends to file the Brooks Solar Farm Connection Needs Identification Document (NID) application with the Alberta Utilities Commission (AUC) on or after March 25, 2022

    Market Participant Notification

    Need Overview

    Latest updates

    • Mar. 25, 2022 AESO Checklist NID Filed: Brooks Solar Farm Connection
    • Mar. 10, 2022 Notice of Filing: Brooks Solar Farm Connection
    • Feb. 24, 2022 Market Participant Notification for the Brooks Solar Farm Connection in the Brooks Area
    • Nov. 30, 2021 Need Overview: Brooks Solar Farm Connection