Buffalo Trail North Wind Project Connection (2232)
ENGIE Development Canada LP (ENGIE) has applied to the AESO for transmission system access to connect its proposed Buffalo Trail North Wind Project (Facility) in the Dunmore area. ENGIE’s request can be met by the following solution:
- Add one 240 kilovolt (kV) transmission line to connect the Facility to the existing 240 kV transmission line 983L in a T-tap configuration.
Add or modify associated equipment as required for the above transmission developments.
Needs Identification Document
Buffalo Trail North Wind Connection Needs Identification Document Checklist [Posted: Apr. 1, 2022]
- Attachment A - TFO Cost Estimate
- Attachment B - Single Line Diagram
Notice of Filing
The AESO intends to file the Buffalo Trail North Wind Project Connection Needs Identification Document (NID) application with the Alberta Utilities Commission (AUC) on or after April 1, 2022.
Market Participant Notification
Market Participant Notification for the Buffalo Trail North Wind Project Connection in the Dunmore area [Posted: Sept. 17, 2021]
Need Overview:
Need for the Buffalo Trail North Wind Project Connection in the Dunmore area [Posted: July 13, 2021]
Latest updates
- AESO Checklist NID Filed: Buffalo Trail North Wind Connection
- Notice of Filing: Buffalo Trail North Wind Project Connection
- Market Participant Notification for the Buffalo Trail North Wind Project Connection in the Dunmore area
- Buffalo Trail North Wind Project Connection