    Buffalo Trail North Wind Project Connection (2232)

    ENGIE Development Canada LP (ENGIE) has applied to the AESO for transmission system access to connect its proposed Buffalo Trail North Wind Project (Facility) in the Dunmore area. ENGIE’s request can be met by the following solution:

    • Add one 240 kilovolt (kV) transmission line to connect the Facility to the existing 240 kV transmission line 983L in a T-tap configuration.

    Add or modify associated equipment as required for the above transmission developments.

    Needs Identification Document

    Buffalo Trail North Wind Connection Needs Identification Document Checklist [Posted: Apr. 1, 2022]

    Notice of Filing

    The AESO intends to file the Buffalo Trail North Wind Project Connection Needs Identification Document (NID) application with the Alberta Utilities Commission (AUC) on or after April 1, 2022.

    Market Participant Notification

    Market Participant Notification for the Buffalo Trail North Wind Project Connection in the Dunmore area [Posted: Sept. 17, 2021]

    Need Overview:

    Need for the Buffalo Trail North Wind Project Connection in the Dunmore area [Posted: July 13, 2021]

    Latest updates

    • Apr. 1, 2022 AESO Checklist NID Filed: Buffalo Trail North Wind Connection
    • Mar. 17, 2022 Notice of Filing: Buffalo Trail North Wind Project Connection
    • Sep. 17, 2021 Market Participant Notification for the Buffalo Trail North Wind Project Connection in the Dunmore area
    • Jul. 13, 2021 Buffalo Trail North Wind Project Connection