    Fox Meadows Wind Project Connection (2460)

    ABO Energy Canada Ltd. (ABO Energy) has applied to the AESO for transmission system access to connect its proposed Fox Meadows Wind Project (Facility) in the Edgerton area. ABO Energy’s request can be met by the following solution:

    • Add a substation, designated as Spalding 1059S including two 138 kilovolt (kV) circuit breakers. 
    • Connect the proposed Spalding 1059S substation to the existing 138 kV transmission line 749AL using an in-and-out configuration.
    • Connect the Facility to the Spalding 1059S substation. 
    • Add or modify associated equipment as required for the above transmission developments.

    Need Overview

    Latest updates

    • Feb. 5, 2025 Need Overview: Fox Meadows Wind Project Connection