Lone Pine Wind Farm Connection (1824)
Lone Pine Wind Project LP. (Lone Pine) has applied to the AESO for transmission system access to connect its proposed Lone Pine Wind Farm (Facility) in the Three Hills area. Lone Pine’s request can be met by the following solution:
- Add one 240 kilovolt (kV) transmission line, to connect the Facility to the existing 240 kV transmission line 925L in a T‐tap configuration.
- Add or modify associated equipment as required for the above transmission developments.
Need Overview
- Need for the Lone Pine Wind Farm Connection in the Three Hills area [Posted: March 27, 2024]
Latest updates
- Need Overview: Lone Pine Wind Farm Connection